Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-security-and-firewall domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/wyltor.com/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/wyltor.com/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/wyltor.com/httpdocs/wp-includes/functions.php on line 6114
TRACTION 1:1 | Wyltor.com
ΕΣΠΑ ΕΠΑνΕΚ 2014 2020

TRACTION 1:1

High Quality. High Rise. High Expectations.

Traction lifts with a machine room are suitable for high-rise buildings. They are also often can be installed and replace old lifts in buildings with an existing machine room.

TMR C Black Green Version

› suitable for high rise buildings

› unique solution to replace lifts in a building that already have a machine room

› superior quality

Efficient destination control solution for optimizing
waiting + travel time and energy consumption, reducing crowd in cars, reducing number of stops per trip and getting lobbies more organized during rush hours.

› customized solutions

Special study and design according to needs or requirements of a building.

Related projects