Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-security-and-firewall domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/wyltor.com/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/wyltor.com/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/wyltor.com/httpdocs/wp-includes/functions.php on line 6114
H&M STORES | Wyltor.com
ΕΣΠΑ ΕΠΑνΕΚ 2014 2020
knez mihajlova

H&M STORES

SERBIA

H&M is the world’s second largest clothing retailer with some 4000 shops
around the globe. In total, elevators were installed in 4 cities of Serbia;
Pančevo, Kragujevac, Zrenjanin and Subotica. A 2-stop MRL panoramic
elevator was installed with the capacity of 2000kg in Pančevo. The total white
epoxy paint gives the elevator a unique & fresh modern look, which matches
the space of the building.

2000 KG

2 STOPS

MRL PANORAMIC

Photo Gallery

More projects

IMG abfbbbaffed V

COMPLEX LAZARET

COMPLEX LAZARET HERCEG NOVI, MONTENEGRO Complex Lazaret is an adaptive reuse of an old 18th Century Venitian Lazaret.This architectural complex consists of two parts: a

hd cityhall

CITY HALL

CITY HALL POLYGYROS, GREECE The installation of an elevator in this project was a special case, as there wasno space predicted in the historic building,

DSCF

RESIDENTIAL BUILDING

LUXURY RESIDENTIAL COMPLEX THESSALONIKI, GREECE 6-stop MRL elevator with a maximum load up to 630 kg, were installed in thefacilities of a luxury residential complex.

sp big

PRIMARY PUBLIC SCHOOL

PRIMARY PUBLIC SCHOOL JASTRZEBIE ZDROJ, POLAND A 4-stop Hydro elevator with a capacity of 800kg was installed in the PrimaryPublic School of Jastrzebie Zdroj, in

pb040255

ALIMOS PEDESTRIAN BRIDGE

ALIMOS PEDESTRIAN BRIDGE ATHENS, GREECE The construction of the pedestrian bridge in Alimos, was completed on October 23th, 2020. As one of the few pedestrian

Hotel Oran Algeria

HOTEL ORAN

HOTEL ORAN ORAN, ALGERIA In a newly established hotel in Oran, Algeria, a 11-stop MRL elevator was installed for the best travel experience and comfort