Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/wyltor.com/httpdocs/wp-includes/functions.php on line 6114
OFFICE & SHOWROOM BUILDING | Wyltor.com
ΕΣΠΑ ΕΠΑνΕΚ 2014 2020
offices

OFFICE & SHOWROOM BUILDING

ATHENS, GREECE

A refurbishment took place in an Office building & Showroom in Athens,
Greece. All of the panels and all the electrical and electronic components
were replaced with new ones, with the addition of 3-plex function

3 ELEVATORS

REFURBISHMENT

3-PLEX FUNCTION

Photo Gallery

More projects

sp big

PRIMARY PUBLIC SCHOOL

PRIMARY PUBLIC SCHOOL JASTRZEBIE ZDROJ, POLAND A 4-stop Hydro elevator with a capacity of 800kg was installed in the PrimaryPublic School of Jastrzebie Zdroj, in

DSCF

RESIDENTIAL BUILDING

LUXURY RESIDENTIAL COMPLEX THESSALONIKI, GREECE 6-stop MRL elevator with a maximum load up to 630 kg, were installed in thefacilities of a luxury residential complex.

hd cityhall

CITY HALL

CITY HALL POLYGYROS, GREECE The installation of an elevator in this project was a special case, as there wasno space predicted in the historic building,

royal hotel

HOTEL

HOTEL THESSALONIKI GREECE In one of the best hotels in Northern Greece, Wyltor installed 1 panoramicelevator with a maximum weight of 1125kg, 1 hydraulic elevator

makedonia palace

MAKEDONIA PALACE

MAKEDONIA PALACE THESSALONIKI GREECE Makedonia Palace is a five star hotel in Thessaloniki. In 44 days time, 4 elevators of 10 stops each (visitors) were

residential valetta malta

RESIDENTIAL BUILDING

RESIDENTIAL BUILDING VALETTA, MALTA For the needs of the residential complex, a 4-stop MRL elevator was installedin Valletta, Malta. 1 ELEVATOR 4 STOPS MRL ELEVATOR