Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/wyltor.com/httpdocs/wp-includes/functions.php on line 6114
OFFICE & SHOWROOM BUILDING | Wyltor.com
ΕΣΠΑ ΕΠΑνΕΚ 2014 2020
offices

OFFICE & SHOWROOM BUILDING

ATHENS, GREECE

A refurbishment took place in an Office building & Showroom in Athens,
Greece. All of the panels and all the electrical and electronic components
were replaced with new ones, with the addition of 3-plex function

3 ELEVATORS

REFURBISHMENT

3-PLEX FUNCTION

Photo Gallery

More projects

Hotel Oran Algeria

HOTEL ORAN

HOTEL ORAN ORAN, ALGERIA In a newly established hotel in Oran, Algeria, a 11-stop MRL elevator was installed for the best travel experience and comfort

cbeefcdfadae

TOWER

TOWER LIMASSOL, CYPRUS In this stunning state-of-the-art high-rise building, 2 long-distance elevators(15 stops) had to be installed. The building is known for its luxury apartmentsand

knez mihajlova

H&M STORES

H&M STORES SERBIA H&M is the world’s second largest clothing retailer with some 4000 shopsaround the globe. In total, elevators were installed in 4 cities

IMG

PRIVATE HOME

PRIVATE HOME LIMASSOL, CYPRUS A 3-stop Hydro elevator was installed in a luxury residency in Limassol,Cyprus. The cabin is defined by the prestigeous look and

hd cityhall

CITY HALL

CITY HALL POLYGYROS, GREECE The installation of an elevator in this project was a special case, as there wasno space predicted in the historic building,

DSCF

RESIDENTIAL BUILDING

RESIDENTIAL BUILDING THESSALONIKI, GREECE In a residential building in Thessaloniki, Greece, a 11-stop Inox Satine/MirrorMRL elevator was installed with a capacity of 900kg at 1,6m/s.