Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/wyltor.com/httpdocs/wp-includes/functions.php on line 6114
PRIMARY PUBLIC SCHOOL | Wyltor.com
ΕΣΠΑ ΕΠΑνΕΚ 2014 2020
sp big

PRIMARY PUBLIC SCHOOL

JASTRZEBIE ZDROJ, POLAND

A 4-stop Hydro elevator with a capacity of 800kg was installed in the Primary
Public School of Jastrzebie Zdroj, in Poland. The elevator was installed in
order to help students with mobility problems.

4 STOPS

800 KG

HYDRO ELEVATOR

Photo Gallery

More projects

pb040255

ALIMOS PEDESTRIAN BRIDGE

ALIMOS PEDESTRIAN BRIDGE ATHENS, GREECE The construction of the pedestrian bridge in Alimos, was completed on October 23th, 2020. As one of the few pedestrian

win stadium ocean

STADIUM

STADIUM SYDNEY, AUSTRALIA Positioned overlooking the Pacific Ocean, in Wollongong (Sydney), and venuecapacity 22.000, this stadium is designed as a multi-purpose facility with theability to

received

LUXURY PRIVATE HOME

LUXURY PRIVATE HOME LONDON, UNITED KINGDOM In the heart of London, a 6-stop MRL elevator with a maximum load capacityof 630kg was installed in a

DSCF

RESIDENTIAL BUILDING

LUXURY RESIDENTIAL COMPLEX THESSALONIKI, GREECE 6-stop MRL elevator with a maximum load up to 630 kg, were installed in thefacilities of a luxury residential complex.

DSCF

RESIDENTIAL BUILDING

RESIDENTIAL BUILDING THESSALONIKI, GREECE In a residential building in Thessaloniki, Greece, a 11-stop Inox Satine/MirrorMRL elevator was installed with a capacity of 900kg at 1,6m/s.

DSCF

OFFICE & SHOWROOM BUILDING

OFFICE & SHOWROOM BUILDING ATHENS, GREECE A refurbishment took place in an Office building & Showroom in Athens,Greece. All of the panels and all the